How Three-Phase Conversion Works
Enter the total power
The full three-phase kW rating of the motor or equipment.
Enter the line-to-line voltage
Voltage between phases — not phase to neutral.
Set the power factor
Motors are inductive, so 0.85 is a realistic starting point.
Read the per-phase current
The result is the amps in each of the three conductors.
Three-Phase Formulas
The √3 (about 1.732) comes from the geometry of three phases spaced 120° apart — it scales the voltage correctly when all three conductors share the power.
Always use the phase-to-phase figure (400 V, not 230 V) in the three-phase formula. Mixing in the phase-to-neutral voltage is the most common mistake.
Multiply the per-phase amps by √3, the line voltage and the power factor, then divide by 1000.
What Three-Phase Power Actually Is
Three-phase power is three AC voltages, each peaking one-third of a cycle after the previous one, sharing the work across three wires. The three waveforms are spaced 120° apart, which means that at every instant at least one phase is delivering near-peak power. The total power flow stays nearly constant instead of pulsing to zero twice per cycle the way single-phase does — and that constant flow is why three-phase motors run smoother, quieter, and with far less vibration than single-phase motors of the same size.
A generator with three coil sets spaced 120° around its rotor produces the three phases naturally, and the grid carries them on three conductors. The calculator result is the current in each of those conductors — identical in all three for a balanced load.
Star and delta in one paragraph
Equipment connects to the three phases in one of two shapes: star (Y), where one end of each phase coil meets at a common neutral point — this gives you both voltages at once, 230 V phase-to-neutral and 400 V phase-to-phase; or delta (Δ), where the coils form a triangle with no neutral, the classic setup for heavy motors. Many motors carry both markings on the nameplate (e.g. Δ 400 V / Y 690 V) and the installer picks the connection to match the supply; the kW-to-amps math is the same either way as long as you enter the correct line-to-line voltage.
Why √3? The Factor Explained Plainly
√3 (≈1.732) is the geometric price of splitting power three ways at 120° — it converts the line-to-line voltage into the true per-phase basis the power equation needs. Here is the intuition: because the three waveforms overlap instead of lining up, you cannot just take single-phase math and divide by three, nor multiply by three — the vector sum of two phases 120° apart lands at √3 times one phase, not 2 times. The formula therefore multiplies the line voltage by √3 to account for how the phases combine.
Sanity-check it against voltages you know: 230 V × √3 = 398.4 V — exactly why a 230 V phase-to-neutral system measures 400 V phase-to-phase.
Line-to-Line vs Line-to-Neutral Voltage
The three-phase formula always wants the voltage measured between two phases (400 V) — never the phase-to-neutral voltage (230 V). This is the single most common three-phase mistake, and it is a dangerous one: feeding 230 V into the formula understates the current by a factor of √3, so the cable and breaker get sized for only about 58% of the real current — roughly 42% too small. On a motor circuit, that means a breaker that trips constantly at best, or cable running hot at worst.
Measure between any two of the three phase conductors with your meter set to AC volts — L1–L2, L2–L3, or L1–L3 should all read about the same. If you only have the line-to-neutral figure (say 230 V from a nameplate), multiply it by √3 to get the line-to-line value (400 V) before it goes anywhere near the formula. And if the nameplate lists something like 400 V Δ, that 400 V is already line-to-line: enter it directly.
Where Three-Phase Power Is Used
Three-phase is the standard for industrial motors, commercial HVAC, large pumps, compressors, and factory machinery. Typical supply levels are 400 V in Europe and much of Asia, 415 V in the UK and India, and 480 V in North American industry.
For the same kilowatt load, three-phase draws far less current per conductor than single-phase — power divided three ways. A 7.5 kW motor at 400 V with PF 0.85 draws (7.5 × 1000) ÷ (1.732 × 400 × 0.85) = 12.74 A per phase. That is why factories use three-phase: thinner cables, smaller breakers, and smoother-running motors.
The savings compound across a whole installation. Compare a 15 kW load: on 230 V single-phase at PF 0.85 it pulls about 76.73 A through one chunky conductor; on 400 V three-phase at the same power factor it pulls 25.47 A per phase through three modest ones. Less copper, smaller breakers, smaller switchgear — and the motors themselves are simpler, since three-phase motors need no starting capacitors or centrifugal switches. You will also find three-phase feeding elevators, commercial kitchens, welders, large UPS systems, and data-center power distribution. US commercial buildings often run 208 V three-phase; heavy industry uses 480 V.
Amps per Kilowatt: Quick Reference
At 400 V three-phase, 1 kW is only 1.44 A per phase — compare that with 4.35 A on 230 V single-phase. Reference table for the standard industrial voltages, at PF 1.0 and at a realistic motor PF of 0.85:
| Line voltage | Amps per 1 kW (PF 1.0) | Amps per 1 kW (PF 0.85) |
|---|---|---|
| 208 V | 2.78 A | 3.27 A |
| 400 V | 1.44 A | 1.70 A |
| 415 V | 1.39 A | 1.64 A |
| 480 V | 1.20 A | 1.42 A |
Two habits make this table fast to use: multiply by the kilowatt rating (a 22 kW pump at 400 V, PF 0.85, is 22 × 1.698 = 37.36 A), and remember that dropping the power factor from 1.0 to 0.85 lifts every figure by about 18%. For rough cable sizing in your head, 400 V three-phase at motor power factors works out to roughly 1.7 A per kW — close enough to sanity-check a quote or a nameplate.
Worked Examples
Example 1 — 15 kW workshop motor. A 15 kW three-phase motor on a 400 V supply, nameplate PF 0.85. I = (15 × 1000) ÷ (1.732 × 400 × 0.85) = 25.47 A per phase. The contactor, overload relay, and cable are all selected against 25.47 A — and the overload relay gets set just above it, not at some rounded-up guess.
Example 2 — 30 kW commercial load. A 30 kW rooftop HVAC package on 480 V three-phase, PF 0.9. I = (30 × 1000) ÷ (1.732 × 480 × 0.9) = 40.09 A per phase. Note how little current 30 kW needs at 480 V three-phase — the same power on 230 V single-phase would be over 150 A.
Example 3 — 22 kW pump. A 22 kW borehole pump on 415 V three-phase (common in the UK, India, and Australia), PF 0.88. I = (22 × 1000) ÷ (1.732 × 415 × 0.88) = 34.78 A per phase. If the nameplate PF were missing, 0.85 is the safe assumption, giving 36.00 A — barely a breaker size of difference.
Common Mistakes and Safety
Mistake number one is the voltage: line-to-neutral (230 V) in the formula instead of line-to-line (400 V) — it understates current by √3 and undersizes everything downstream. Close behind: forgetting the power factor entirely (motors are never PF 1.0), and the folk formula of “dividing by 3” instead of multiplying by √3, which has no basis in the physics and gives a wrong answer with false confidence.
- Assuming balanced load. The formula gives the per-phase current for a balanced load. If one phase carries single-phase loads tapped phase-to-neutral as well, that conductor runs hotter than the calculation says — measure all three phases under real load when commissioning.
- Motor starting current. A direct-on-line motor gulps 5–7× its running current for a few seconds at startup. Running amps size the cable; starting current sizes the breaker trip curve and the contactor — and is why large motors use star-delta or soft starters.
- Undersized neutral. On systems with heavy single-phase loads mixed into a three-phase board, triplen harmonics can overload the neutral even when the phases look balanced. Size the neutral properly; do not assume it carries “almost nothing.”
On safety, be blunt with yourself: three-phase means higher voltages, higher fault currents, and arc-flash energy that can be lethal. Lock out and tag out before touching anything, prove dead on all three phases (not just one), and never work live. Three-phase installation and fault-finding are licensed-electrician territory everywhere — this page covers the arithmetic so you can check a quote or size a preliminary design, not so you can wire a panel.